Top Shops Executive Summary

2012

Issue link: https://mmstopshopsexecsummary.epubxp.com/i/75155

Contents of this Issue

Navigation

Page 17 of 27

Executive Summary TOP SHOPFLOOR PRACTICES & PERFORMANCES 2008 Median Average 80th Percentile 20th Percentile Setup time (time it takes to prepare a new job for machining — i.e. the time between the completion of the last good piece of the current run and the first good piece of the next run) 2011 (hrs) Median Average 80th Percentile 20th Percentile 2008 (hrs) Median Average 80th Percentile 20th Percentile On-time delivery rate (percentage of goods delivered on time) 2011 Median Average 80th Percentile 20th Percentile 2008 Median Average 80th Percentile 20th Percentile Finished-product first-pass quality yield (percentage of product that passes final inspection) 2011 Median Average 80th Percentile 20th Percentile 99.0% 98.3% 99.0% 98.0% 97.0% 92.8% 99.0% 90.0% 98.0% 93.8% 99.0% 90.0% 90.0% 87.7% 95.0% 80.0% 90.0% 84.3% 97.0% 75.0% 90.0% 84.9% 97.0% 75.0% 95.0% 92.3% 98.0% 87.8% 90.0% 88.0% 98.0% 80.0% 92.0% 88.7% 98.0% 80.0% 2.0 4.2 3.0 1.0 2.0 3.8 5.0 1.4 3.0 4.8 5.0 1.0 3.0 5.7 6.0 1.0 2.0 4.7 5.0 1.0 3.0 5.3 6.0 1.0 SHOPS OTHER SHOPS 40.0% 40.3% 60.0% 20.0% 30.0% 39.4% 75.0% 10.0% ALL SHOPS 30.0% 39.6% 75.0% 10.0% 16 2012 TOP SHOPS EXECUTIVE SUMMARY mmsonline.com/topshops

Articles in this issue

Links on this page

Archives of this issue

view archives of Top Shops Executive Summary - 2012