Top Shops Executive Summary

2012

Issue link: https://mmstopshopsexecsummary.epubxp.com/i/75155

Contents of this Issue

Navigation

Page 19 of 27

Executive Summary TOP SHOPFLOOR PRACTICES & PERFORMANCES Spindle utilization time (in-cut time as a percentage of machine uptime) 2011 Median Average 80th Percentile 20th Percentile 2008 Median Average 80th Percentile 20th Percentile Overall equipment effectiveness (percentage machine availability × percentage quality yield × percentage of optimal rate that equipment operates) 2011 Median Average 80th Percentile 20th Percentile 2008 Median Average 80th Percentile 20th Percentile 71.5% 69.9% 84.4% 60.0% 70.0% 65.2% 85.0% 50.0% 70.0% 66.2% 85.0% 50.0% 80.5% 78.2% 90.8% 62.4% 75.0% 70.1% 89.2% 50.0% 75.0% 71.7% 90.0% 55.0% 70.0% 69.1% 85.0% 59.0% 60.0% 54.0% 80.0% 30.0% 60.0% 56.8% 80.0% 30.0% 81.0% 76.0% 90.0% 64.4% 65.0% 58.2% 85.0% 30.0% 70.0% 61.5% 85.0% 35.0% SHOPS OTHER SHOPS ALL SHOPS 18 2012 TOP SHOPS EXECUTIVE SUMMARY mmsonline.com/topshops

Articles in this issue

Links on this page

Archives of this issue

view archives of Top Shops Executive Summary - 2012